In a city like Ahmedabad where there are limited scopes of widening the existing roads to cater the need of future vehicular population, swanky and multipurpose flyovers seems the best option, believes the authority of Ahmedabad Municipal Corporation (AMC). Keeping this in mind, civic chief Mukesh Kumar has proposed a three-layer flyover connecting it two places of the city.
AMC is putting a lot of money into giving a world-class infrastructure to the city. For the proposed two swanky flyovers, the civic body has already announced the investment of Rs 20 crore in the next fiscal.
"Growing traffic is one of the biggest challenges any city is facing which needs to be addressed with smart solutions. The infrastructure projects in a smart city like ours will be compatible with the mega city status too. Such state of art projects are planned for finding a permanent solution for the traffic projects," said Mukesh Kumar, municipal commissioner, AMC.
Giving more details about the upcoming three layer flyovers at Nehrunagar and Paldi, deputy municipal commissioner Mukesh Gadhvi said, "The two spots faces highest traffic flow during the pick hours. Moreover, this area connects commuters to the Kalupur railway station and Geeta Mandir state transport terminus. Many of the time in traffic snarl, people gets stuck and miss their other mode of transportation like rail or bus." "The proposed three-layer flyovers at Paldi and Nehrunagar are connected and an alleviated way starting from Jamalpur to Kalupar will make a way for all vehicles to run smoothly from SG Highway to Kalupur," remarked Gadhvi.
New flyover at Nehrunagar
The first layer will be an underpass, 2.5 metres deep, will run be from Sahjanand College to Shreyash Crossing. Also, a foot-over bridge for pedestrians parallel to the underpass will come up.
The second layer will have four arm circles for all the right turns, coming from the four sides. There won't be any left turn on the circles the height of which will be around 12 to 15 metres.
The third level will be a straight way from Satellite to Ambawadi at around height of 30 to 34 meters.
3-LAYER FLYOVERS
- The first layer of underpass will be from Jalaram temple to Paldi crossroads.
- The second layer will be of four arm circle for over the Paldi Crossroads for the general traffic flow, with the same rule at all turns will be the right turns.
- Another flyover of the third layer will be from the Mahalakshmi crossroads to Kochrab Ashram side.