The National High-Speed Rail Corp Ltd (NHSRCL) has said that the land required to complete the Bullet Train project will be acquired by December this year. 508-KM Bullet Train project which will connect the cities of Ahmedabad and Delhi will start part of its operation by 2022.
NHSRCL spokesperson Sushma Gaur told IANS that land will be acquired once the tenders were finalized for the project. The agency has not taken nine hectares required in Dadra and Nagar Haveli.
"Major chunk of the land acquisition is likely to be completed by December 2019," she said.
"Two or three months back the total land acquired was 33%. And within 90 days we were able to acquire over 6% more land", IANS quoted NHSRCL spokesperson as saying.
In September 2017, Prime Minister Narendra Modi and Japanese Prime Minister Shinzo Abe unveiled the Bullet Train network when Shinzo Abe was on a two-day visit for the annual summit between two nations.
The Japan International Cooperation Agency (JICA) and the Railway Ministry had signed an MoU to kickstart the Rs 1.08 lakh crore project.
The NHSRCL has so far acquired only 39% of the required land required to build this high-speed rail project.
An official said that NHSRCL was building a tunnel between Boisar and BKC in Mumbai which would be 21km long and 7km of it will be under the sea.
The Bullet Train will cover 508 KM at a speed of 320 km per hour.
It will cover the distance between two cities in two hours.